§ 12-56-28. Plans to be filed upon execution of work.  


Latest version.
  • Plans showing all details of conduit construction and the disposition of all electrical conductors and apparatus within or connected with the conduits shall be filed with the director of public works promptly upon the execution of any work, so that a complete record of all conduits, with their appurtenances and over-ground connections, together with the electrical conductors and apparatus installed in connection therewith, shall at all times be on file with the director of public works.

(Code 1967, § 29-49; Code 1985, § 27-51)