§ 9-52-2. Approval of plans for construction and alteration of food service establishment.
Latest version.
Whenever a non-temporary food service establishment is constructed or extensively
remodeled and whenever an existing structure is converted to use as a food service
establishment, at least one set of properly prepared plans and specifications for
such construction, remodeling, or conversion shall be submitted to the health department
for review and approval at least 15 days before construction, remodeling, or conversion
is begun. The plans and specifications shall indicate the proposed menu, layout, arrangement,
mechanical plans, and construction materials of work areas, as well as the type and
model of proposed fixed equipment and facilities.
After the plans and specifications have been approved by the health department, the
food service establishment shall not start operations until a preoperational inspection
has determined compliance with the approved plans and specifications and the requirements
of this article and the TDH/TDA Rules and Regulations as referenced below.
Reference: Tennessee Department of Health Rules and Regulations Chapter 1200-23-1.02
et seq, and Tennessee Department of Agriculture Rules and Regulations Chapter 0080-4-9
et seq.
(Ord. No. 5542, § 1, 12-17-2013)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');