§ 14-12-31. Inspection reports.
City inspectors and special inspectors shall, within one year from the effective date of these rules for power boilers and two years for all other objects, submit to the chief inspector an inspection report on each boiler or unfired pressure vessel subject to inspection by such inspectors. Complete data shall be submitted on each nonstandard boiler or unfired pressure vessel on Form P-5 of the A.S.M.E. Code at the time of the first internal inspection. Subsequent internal or certificate inspections of those objects shall be reported on Form P-6 of the A.S.M.E. Code. On all standard boilers or unfired pressure vessels, the first and subsequent internal or certificate inspection shall be submitted on Form P-6 of the A.S.M.E. Code. The report shall be submitted within ten days of the date of the inspection and for unfired pressure vessels shall indicate the maximum period between certificate inspections. External inspections shall be reported on Form P-6 immediately when hazardous conditions affecting the safety of the boiler or unfired pressure vessel are found to exist.
(Code 1967, § 45-51; Code 1985, § 42-55)