Memphis |
Code of Ordinances |
Title 14. BUILDINGS AND CONSTRUCTION |
Chapter 14-12. BOILER AND UNFIRED PRESSURE VESSEL CODE |
Article 3. RULES AND REGULATIONS RELATING TO ADMINISTRATION |
§ 14-12-25. Preparation for inspection.
Latest version.
The owner or user shall prepare each boiler or unfired pressure vessel for internal inspection and shall prepare for and apply a hydrostatic pressure test whenever necessary, on the date specified by the chief inspector, deputy inspector or special inspector, which date shall be not less than seven days after the date of notification.
(Code 1967, § 45-45; Code 1985, § 42-49)